Heating Systems and Boilers Replacements are undertaken using our own Staff, who are all Qualified and Certified to Install and Commission Heating Systems and Boilers in Accordance with the Latest Building Regulations.

We have undertaken extensive research into the products we specify, to ensure only the best available products are used along with excellent manufacturers support and product warranties that are the best in the Industry – an example of the manufacturers we work closely with as follows

Grant UK  – Oil Boilers, (Including Blue Flame Technology) Heat Pumps, Solar Hot Water, Biomass Boilers

The New Grant Vortex Blue Flame Boiler                          The Grant Vortex Blue Flame Burner

  

Commissioning of the New Grant Vortex Blue Flame Boiler and Burner

  Print

Viessmann UK – Gas Boilers, Solar Hot Water System, Un-Vented Hot Water Cylinder

Shelford Heating have been installing Viessmann Boilers since 2005, We chose Viessmann as our No 1 Boiler because:

  • Industry Leading 5 Year Warranty on all Components, and 10 Years on the Main Heat Exchanger
  • The Option to Increase Warranty on all components to 10 Years
  • A Quality Product that should give many years service.
  • It high level Customer Care and Technical Support
  • Our ability to Communicate with Viessmann and we are not just a number, but a Loyal Installer that is appreciated.
  • The Training we receive at a number of Viessmann Training Academies

  viessmann-links

 

honey-well

For the Latest in Heating Controls that can be controlled by mobile devices running android and IOS operating software visit Honeywell UK  to see the fantastic range of devices from a simple thermostat, to the full house control system Evohome

All Customer Enquiries are treated individually, with a Site Visit undertaken to discuss your needs, ensuring that a system is designed tailored to your requirements and is efficient in operation without breaking the bank?

We operate a policy of open book quotes, at the quotation stage you will be presented with a full detail of the specification and parts to be installed, Our Quotes are never discounted, we do not believe in sales techniques offering large discounts, but we do believe in Honesty and Openness with the view that if we make savings on any quote, we will pass this saving onto YOU our Customer.

TECHNOLOGY STANDARD GRANT GUARANTEE STANDARD GRANT GUARANTEE REGISTERED WITHIN 30 DAYS STANDARD GRANT GUARANTEE REGISTERED BY G-ONE INSTALLER
OIL BOILERS (VORTEX PRO & ECO) 1 year 2 years 5 years* 2 years added by Shelford Heating if annually maintained by Shelford Heating Ltd on an Annual Basis giving 7 years parts and labour warranty
OIL BOILERS (VORTEXBLUE) 1 year 2 years 10 years**
SOLAR THERMAL – PANEL 1 year 5 years 10 years
SOLAR THERMAL – KIT 1 year 5 years 5 years
CYLINDER BODY 1 year 25 years 25 years
CYLINDER COMPONENTS 1 year 2 years 5 years
HEAT PUMPS 1 year 2years 5 years
BIOMASS 1 year 2 years 5 years
CONTROLS 1 year 5 years 5 years

*Product must be fitted with a Grant Vortex Mag-One magnetic filter or equivalent specification filter

**Product must be installed between 18th April 2016 and 14th April 2017. Product must be fitted with a Grant Vortex Mag-One filter.

In order for a product to be eligible for the extended guarantee, in addition to being fitted by a G-One installer, two other principal conditions must be met:

Vortex oil boilers, Aerona heat pumps, and Grant biomass boilers must also be fitted with a Grant Mag-One filter (or equivalent/higher specification filter)

All Grant products must be registered via the G-One Portal within 30 days from the date of installation.

All other components installed come with a minimum 12 months parts and labour warranty, this does not affect your statutory rights

Heating Systems that we Install using the Viessmann Range of Gas Boilers come inclusive of a 5 Year Parts and Labour Warranty on the Boiler only, this can be further extended to 10 years for a small fee and is advised by Viessmann separately.

Important Information

Only approved Companies Certified with the Correct Trade Bodies such as OFTEC, CORGI, Gas Safe and APHC, Microgeneration Certification Scheme (MCS) can Install Commission and Certify Installations for Building Regulation Approval, the exception being the Local Building Control Authority who will for a nominal charge undertake this, providing the Installation has been Commissioned by Competent Persons.

Having an Installation completed by a non-approved company, who then employs a competent company is not accepted